(760) 571-2509Free Quote

Three Forms and a Slope: Handling Rainwater on a Carlsbad ADU Lot

Nobody builds an ADU for the drainage. But the roof you add sheds water somewhere, and Carlsbad's engineering forms and the building code's grading rule decide whether that somewhere is on paper before it's in the dirt.

Published Nov 15, 2026

Most Carlsbad lots were shaped before the houses went on them. Streets curve, pads step down a hillside, and a swale along the back fence quietly carries rain to a storm drain you've never seen. Drop a new ADU into that arrangement and you change the arithmetic: more roof, maybe a path, maybe a patio, and water that arrives faster than it used to.

The City asks you to account for that. Its engineering department publishes a short list of forms for grading and storm water, and a few of them are likely to land in front of you. Here's what they are, in the order you'd probably meet them, followed by the slope rule in the building code that governs the ground beside your new walls.

Form one: the questionnaire that sorts your project

The first document in the City's grading and storm water list is the Storm Water Standards Questionnaire, form E-34. Its job is to place a project in a category. Regional storm water rules for San Diego County sort development into standard projects and priority projects. Standard projects need basic site design and source control measures. Priority projects, which are larger or sit in more sensitive settings, add treatment measures.

A typical backyard ADU is unlikely to land in the priority group, but the questionnaire is how that's decided, not an assumption. The designer or engineer fills it in using your site data: how much new roof, how much new paving, what's being disturbed, and what's nearby. Your part is giving them accurate numbers and an honest description of the lot.

The regional Model BMP Design Manual, which the City's process follows, is where the standards behind the questionnaire come from. You won't read it cover to cover. It's useful to know it exists, because a plan comment that cites a "BMP" is pointing there.

Form two: the checklist of standard requirements

For projects that come out as standard, the City publishes a Standard Project Requirement Checklist, form E-36. We're not reproducing the form here, so read the current version yourself. In general terms, standard-project measures across the San Diego region draw on site-design ideas like these:

The City's engineering forms page also points to a resource on low impact development. The idea behind it is simple: slow the water, spread it out and let it soak in.

For you, this checklist is where a design choice becomes a line on the plan. If the downspout will discharge onto a planted strip, the plan shows it. If a path will be pavers with gaps instead of solid concrete, that's noted too.

Form three: construction-phase paperwork

Separate from the finished design is the question of how the site is protected while work is under way. The City's list includes a form for determining the project's tier level and construction threat level. The City publishes separate pollution prevention plan templates for its Tier 1 and Tier 2 levels, which tells you the level of detail depends on where the project lands.

Your contractor handles this paperwork. What you'll notice at home is gravel bags along the lower edge of the site, a stabilized entrance where trucks come in and out, covers on soil piles, and a plan for washing out concrete. Those features are the visible face of the form.

If the ADU involves grading beyond the building footprint, a grading permit application, form E-24, may enter the picture. Whether yours does depends on the scope the City sees, not on the form's existence, so don't assume either way.

The slope: what the building code says about the ground beside your walls

The forms govern the paperwork. The California Building Code governs the ground. Its grading section says the soil immediately adjacent to a foundation should slope away at a minimum of 5 percent, for at least 10 feet, measured out from the wall. If a lot line or an obstruction keeps you from getting 10 feet, the 5 percent slope runs to an approved way of diverting water.

Smaller details follow:

A slope of 5 percent drops about six inches over ten feet. That's easy to build and easy to lose: a planter box edged with a wall, a patio poured flat, or a path that dips can each hold water against the structure. When your plans come back, find the grading sheet and look for the arrows showing which way the ground falls.

Near the property lines

ADUs often sit four feet from a side or rear line, and many Carlsbad lots are bounded by a neighbor's wall or an HOA drainage easement. Think about:

Pulling the rain plan together

A workable plan fits on one page of your own notes:

  1. Roof area, gutters, and where each downspout discharges.
  2. A direction arrow for every hard surface.
  3. The route from each discharge point to the street, a swale or a planted area.
  4. Where the questionnaire puts you, and the measures the checklist expects.
  5. Construction-phase protection, and who maintains it.

The ADU's utility trenches add another layer, because they cross the same ground. Our utilities page explains how those lines are laid out, and the detached ADU page covers placement. If size is the constraint, our post on school fees and the 500 square foot line shows how a smaller footprint changes more than one thing.

We work with verified contractors who put water in the plan before it becomes a problem in the yard. If you'd like help thinking through your lot, request a Free Quote consultation.

Sources (accessed Nov 16, 2026): Engineering Applications & Forms (Grading and Storm Water) (City of Carlsbad) · Model BMP Design Manual, San Diego Region (Project Clean Water (San Diego region municipalities)) · Section 1804, Excavation, Grading and Fill, California Building Code (International Code Council / State of California)